Replacing A Raid Controller Card Inside The Server Node - Cisco UCS C3160 Installation And Service Manual

Hide thumbs Also See for UCS C3160:
Table of Contents

Advertisement

Chapter 3
Maintaining the System

Replacing a RAID Controller Card Inside the Server Node

The Cisco modular RAID controller card connects to a mezzanine-style socket inside the server node.
The SuperCap power module (SCPM) comes already attached to a new card, so you do not have to
remove that separately.
Shut down and remove power from the entire system, as described in
Step 1
the System, page
Remove a server node from the system:
Step 2
a.
b.
c.
Remove the server node cover as described in
Step 3
Remove a Cisco modular RAID controller card:
Step 4
a.
b.
Install a Cisco modular RAID controller card:
Step 5
a.
b.
c.
Install the heat sink assembly to the controller card:
Step 6
a.
b.
c.
Replace the server node cover as described in
Step 7
Install a server node:
Step 8
a.
Note
b.
c.
Replace power cords and then power on the system by pressing and holding the power button on the front
Step 9
handle for four seconds.
See
Step 10
configuration.
OL-32062-01
3-9.
Grasp the two ejector levers and pinch their latches to release the levers (see
Rotate both levers to the outside at the same time to evenly disengage the server node from its
midplane connectors.
Pull the server node straight out from the system.
Loosen the two captive thumbscrews that secure the card to the board (see
Grasp the card at both ends and lift it evenly to disengage the connector on the underside of the card
from the mezzanine socket.
Align the card and bracket over the mezzanine socket and the three standoffs.
Press down on both ends of the card to engage the connector on the underside of the card with the
mezzanine socket.
Install the screw that passes through the supercap power module (backup battery) cover.
Remove the protective tape from the thermal interface that is on the underside of the heatsink.
Align the heat sink assembly and its two captive screws with the holes in the controller card.
Tighten the two captive screws to the two standoffs that are under the controller card.
With the two ejector levers open, align the new server node with the empty bay.
The server node must be in the top bay, as shown in
Push the server node into the bay until it engages with the midplane connectors and is flush with the
chassis.
Rotate both ejector levers toward the center until they lay flat and their latches lock into the rear of
the server node.
Restoring RAID Configuration After Replacing a RAID Controller, page C-2
Installing or Replacing System Components
Removing the Server Node Cover, page
Removing the Server Node Cover, page
Figure 1-2 on page
Cisco UCS C3160 Rack Server Installation and Service Guide
Shutting Down and Powering Off
Figure
3-15).
3-12.
Figure
3-24).
3-12.
1-2.
to restore your RAID
3-39