Cisco UCS C3160 Installation And Service Manual page 30

Hide thumbs Also See for UCS C3160:
Table of Contents

Advertisement

Installing the Server In a Rack
Figure 2-4
1
Intermediate rail pulled out from outer rail
2
Inner rail mounted on server
(Optional) Secure the server in the rack more permanently by using the two screws provided with the
Step 6
slide rails. For example, you can install these screws if you plan to move the rack with servers installed.
With the server fully pushed into the slide rails, open a hinged slam-latch lever on the front of the server
and insert the screw through the hole that is under the lever. The screw threads into the static part of the
rail on the rack post and prevents the server from being pulled out. Repeat for the opposite slam latch.
Caution
When you pull the server outward from the rack, it stops at internal locking stops. Do not depress the
release clips on the inner rails (see
Depressing the release clips on the inner rails allows the server to slide all the way out of the intermediate
rails and could result in injury or equipment damage.
Cisco UCS C3160 Rack Server Installation and Service Guide
2-8
Attaching Rail Assembly to the Rack Post
3
Figure
2-4) unless you intend to remove the server from the rack.
1
2
3
Inner rail release clip
Chapter 2
Installing the Server
OL-32062-01

Advertisement

Table of Contents
loading

Table of Contents