BEFORE YOU BEGIN

UTILITY REQUIREMENTS

INS 61301607027 Rev A US
SECTION 4 INSTALLATION
CAUTION
Follow the instructions in this manual to ensure safe and efficient
performance of the equipment. Failure to comply with these instructions or
to provide specific services could void the equipment warranty.
NOTE
Before installing the sterilizer, be sure the location is prepared for water,
electrical power, steam, and waste as outlined on the roughing-in drawing
(Figure 6–1, Sheet 5 on page 6–6).
Review the technical requirements for standard and optional equipment
outlined in this chapter and in Section 5, Optional Equipment.
The following utility connections (as specified on the roughing-in drawing)
are required for all sterilizers:
• Manual shutoff valves, pressure gauges, and steam trap (supplied by
customer) for the water and steam supplies at the sterilizer site.
NOTE
Unions must be used for the steam supply, cold water supply, and pressure
relief valve connections to the sterilizer.
• Steam Supply (S). The steam source may be either an integral steam
boiler or a facility steam supply.
• Cold Water Supply (CW). A backflow preventer (supplied by customer)
must be installed as required by local codes.
• 120 Vac Electrical Supply (E). Conveniently accessible fused
disconnect switches (supplied by customer) are required in all electrical
supply lines at the sterilizer site.
• Three-phase Electrical Supply (K). Required if an integral steam boiler
is used. Available boiler voltages are 208, 240, 480, and 600 Vac.
• Drain (D).
• Pressure Relief Valve (SV).
INSTRUCTIONS
4–1