Tools And Materials Required - Getinge 600 Series Installation Manual

Steam sterilizers
Hide thumbs Also See for 600 Series:
Table of Contents

Advertisement

Installation Instructions
TOOLS AND MATERIALS
REQUIRED
4–2
The following tools are required to install the sterilizer:
• 2 ft. spirit level
• torpedo level
• try square (or tape measure)
• torque driver set
• spanner wrench (supplied by Getinge—see Figure 4–1)
• 2 in. x 2 in. shims (see note below)
NOTE
Place shims under leveling feet and door motor mounting plate leveling
bolts to prevent damage to soft flooring materials such as linoleum. Single
door units require 8 shims, double door units require 16 shims.
The door alignment pins may be used as a guide when leveling the door.
See "Leveling the Sterilizer Door" on page 4–13.
FIGURE 4–1. INSTALLATION TOOLS
Alignment Pins
Spanner Wrench
A07027-BL
INS 61301607027 Rev A US

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents