Getinge 600 Series Installation Manual page 121

Steam sterilizers
Hide thumbs Also See for 600 Series:
Table of Contents

Advertisement

upper floor 6–12, 6–13
seismic anchoring brackets 4–28
shipping bolts 4–7
shipping weight 3–1
single door installation
freestanding 4–3
recessed 4–3
spanner wrench 4–2
stabilizing casters 4–8
steam boiler
electrical connection 5–4
feedwater quality 7–5
models 4–21, 5–2
plumbing connections 5–2, 5–3
utility requirements 5–2
steam conditioning package 7–4
steam supply 4–1
steam supply quality 7–3
T
tools and materials 4–2
torque specification
mounting hardware 4–7
steam boiler 5–7, 5–8
INS 61301607027 Rev A US
torque specifications
steam boiler 5–6
transfer carriage height adjustment 4–6
U
uninterruptible power supply (UPS) 5–18
universal transformer 4–23, 5–16
unpacking
cabinet package 5–27
sterilizer 3–2
UPS
electrical connection 5–20
mounting 5–19
unpacking 5–19
utility requirements 4–1, 4–19
W
water treatment system 5–25, 7–6
water-saver
electrical connection 5–24
installation requirements 5–22
plumbing connections 5–20
600 Series Steam Sterilizers
Index–3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents