Toshiba RAV-162BH-PE Service Manual page 65

Air-conditioner split built-in duct type, heat pump; split ceiling type, heat pump; split wall type, heat pump; split cassette type, heat pump
Table of Contents

Advertisement

Fan Control Output
R Y 0 7
R Y 0 2
R Y 0 3
G 4 U - 1
A J E 6 4 1 2
A J E 6 4 1 2
TA
TC
Shift
Shift
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
R Y 0 1
A J E 6 4 1 2
To CPU
Model Change
-65-
www.heronhill.co.uk
Heater
Louver Output
R Y 1 3
R Y 1 1
G 4 U - 1
G 4 U - 1
8.9
Relay circuit
The relay circuit consists of the diagram above.
The relay performs the following functions:
RY01 : Main switching relay
RY02 : Changing over H/M of fan
RY03 : L tap of fan
RY04 : UL tap of fan
RY11 : Turning louver on and off
RY14 : Turning drain pump on and off
To CPU
8.10
Switch circuit
TA shift, TC shift and unit No. are changed over by the
switch.
TA shift and TC shift are set in factory with unit No. at "1".
In servicing, the setting should be made to the same
TA/TC shift as the PC board attached originally.
In case of operating one single unit, unit No. "1" will do.
With the operation of many units (multi units control) the
unit No. should be adjusted in such a way as 1, 2, 3 ........
Fax: 01823 665807
Drain pump
R Y 1 4
G 4 U - 1
D 1 5
1 5 5 1 7 6
(
-
)
Unit Number

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents