Omron CJ2 User Manual page 148

Cj series
Hide thumbs Also See for CJ2:
Table of Contents

Advertisement

5 Installation
4.
Assemble the connector (purchased separately).
Connector cover
Socket
Nuts (3)
5.
Insert the wired connector.
6.
Remove the protective label after wiring has been completed to allow air circulation needed for
cooling.
Connector lock screws
Tighten the connector lock screws to a torque of 0.2 N·m.
5-30
Small screws (3)
Cable bracket
Nuts (2)
ID261
0
1
2
3
4
5
6
7
I
8
9
10 11
12 13 14 15
0
1
2
3
4
5
6 7
II
8
9
10 11
12 13 14 15
Basic I/O Unit
Connector
After wiring
ID261
0
1 2 3 4 5 6 7
I
8
9
10 11
12 13 14 15
0
1 2
3 4 5
6 7
II
8
9
10 11
12 13 14 15
Small screws (2)
Connector lock
screws
Connector
Remove label after wiring.
CJ2 CPU Unit Hardware User's Manual
Basic I/O Unit

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cj1-hCj1mCj1

Table of Contents