Final Checks; Fitting The Product Casing; General Checks - Navien NCM-1130HH Installation Instructions Manual

Gas fired waa mounted stirling engine m-chp
Table of Contents

Advertisement

5.6 Final checks

5.6.1 Fitting the product casing

1) Engage the casing onto the top panel and fasten the two clamps on the top panel together
with clamp.
Take care not to trap any cables. Secure with the bolts.
2) Remember to plug the facia control lead into the controls enclosure.

5.6.2 General Checks

Make the following checks for correct operation.
1) Turn the product thermostat or controller ON and OFF to check that the burners are lit and
extinguished.
2) Check that the programmer and all other system controls function correctly. Operate each
control separately and check that the burners respond.
3) Using a suitable analyser check the C0
the soundness of the flue seals.
4) Water circulation system.
a) With the system HOT examine all water connections for soundness.
b) With the system still HOT turn off the gas, water and electricity supplies to the
product and drain down in order to complete the flushing process. This is the final
system flush 'Hot'
c) Refill and vent the system, clear all air locks and again check for water soundness.
When venting the product using the air vent on supplementary heat exchanger ensure
that suitable care is taken so that water does not fall onto the product or controls.
d) Balance the system.
5) Complete the KD NAVIEN commissioning form
6) Finally, set the controls to the User's requirements.
Navien stirling engine m-CHP installation manual
level in the air duct. If this exceeds 0.002% check
2
58 of 88
Page No:

Advertisement

Table of Contents
loading

Table of Contents