Pre-Run Machine Inspection; Starting Machine; Emergency Stop Procedure - Windsor Chariot 2 CBPS20 Operating Instructions Manual

Table of Contents

Advertisement

Operation
Machine Operation

Pre-Run Machine Inspection

Do a pre-run inspection to find possible problems that
could cause poor performance or lost time from break-
down. Follow the same procedure each time to avoid
missing steps.
NOTE: See maintenance section for pre-run machine
inspection checklist items.

Starting Machine

NOTE: Perform pre-run machine check before
operating machine.
FOR SAFETY: Before starting machine, make sure
that all safety devices are in place and operating
properly.
1. Disconnect or unplug battery charger.
2. Close the cover(s).
3. Verify condition of burnishing pad, replace if neces-
sary.
4. Verify removable pad driver is installed correctly
and pad rotation lock is released.
5. The operator should be on the pedal platform. The
throttle pedal must be in the neutral position.
6. Turn the machine power on by turning key switch
clockwise to the "ON" position.
7. Verify dust collection bag is installed.
8. Press the Drive Reset Directional Control Switch to
reset and set the intended direction for travel.
9. Press lightly on the throttle pedal with right foot

Emergency Stop Procedure

Push in emergency stop button. This will also engage
the parking brake and cause the machine to stop imme-
diately.
20
86356230 Chariot iGloss

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents