MACHINE OPERATION

PRE-RUN MACHINE INSPECTION

1. Disconnect the battery charger. (See battery
charging procedure).
2. Close the cover.
3. To raise the deck: Turn on the main power
switch and press the burnishing head switch.
4. Turn or install a new burnishing pad as needed.
NOTE: Pad lock has left hand threads. To
loosen turn clockwise.
5. Check wheels and other pivot points for proper
lubrication.

OPERATING THE MACHINE

1. If using a machine that is already set up, check
to make sure the pad is properly installed.
2. Adjust the operating control handle to a
comfortable position using the handle lock lever.
3. Turn on the main power switch.
4. Lower or raise deck by pressing burnishing head
switch.
5. The pad motor will only run when the burnishing
head is lowered to within 3 inches of the floor.
6. The drive controls are shown on page 3-1.
7. The pad pressure is adjusted using the knob at
center of panel. The operator monitors the amp
draw using the meter located on the control
panel and ensures that the needle remains in
the "green" operating
range. (See page 3-1, #4 & 11).
To prevent possible damage to the floor surface,
always keep the machine moving while the pad
is spinning.
8. When the pad motor switch bar is squeezed, the
pad motor runs.
9. Return the machine to the battery charger when
the battery light indicator light is amber. Do not
operate machine when indicator is flashing red.
3-2ENG

FILTER BAG

The filter bag is accessed under the cover.

DUST CONTROL SKIRT

Replace skirt (86007290 – PRV NO. 730017) when
worn, torn, or damaged in any way that allows dust
to escape.
86038450 04/12/07