Defrosting Operation - Mitsubishi Heavy Industries SRK20ZJX-S Service Manual

Hide thumbs Also See for SRK20ZJX-S:
Table of Contents

Advertisement

(4) Defrosting operation

(a)
(Th2) (Th1) > = 0.44 × (Th2) + A
Th2
2 °C < = Th2
15 °C < = Th2 <
Th2 <
0
-5
-10
-15
-20
-20
-15
2
(b)
3
Heating operation
40
40
h
2
A
4
2 °C
6
15 °C
6
0
-5
-10
Defrost operation
start
-15
-10
-5
0
-20
-20
-15
-10
Outdoor air temperature (℃)
Outdoor air temperature (℃)
h
Heating operation
Max. 12 minutes and 50 seconds
※ Depends on an operation condition, the time can be longer than 7 minutes.
h2
Defrost operation
start
5
10
-5
0
5
20
º
Max. 12 minutes and 50 seconds
Hot keep operation
※ Depends on an operation condition, the time can be longer than 7 minutes.
29
-
-
'10 • SCM-SM-094
h
10
h
2
2~7 minutes※
2~7 minutes※
Hot keep operation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents