Outdoor Units - Mitsubishi Heavy Industries SRK20ZJX-S Service Manual

Hide thumbs Also See for SRK20ZJX-S:
Table of Contents

Advertisement

FUSE
250V 15A
TB1
BK
BK
R
L
IN
POWER
WH
WH
S
N
IN
SUPPLY
Y/G
G1
Y/G
G
Y/G
TB2
1 BK
WH
UNIT A
2
CNA
RD
3
TB3
BK
1
WH
CNB
UNIT B
2
BR
3
CNHEAT
CN20S
WH
RD
HEATER
20S
Color Marks
Mark
Color
Mark
Color
BK
Black
YE
Yellow
RD
Red
Y/G
Yellow/Green
WH
White
OR
Orange
BR
Brown
WIRING DIAGRAM
S-1
C-1
CNMAIN
CN20V
PWB 2(SUB)
G2
CNEEV1
CNTH
Y/G
2
WH
RD
M
M
EEV
EEV
TH4
A
B
Meaning of Marks
Item
Description
CNA-CN20S
Connector
20S
4 Way valve(coil)
CM
Compressor motor
EEV A,EEV B
Electric expansion valve
(coil)
FMo
Fan motor
HEATER
Crank case heater
BK
R
R
O
WH
S
S
O
YE
T1
WH
R
S-2
OR
T2
RD
C-2
5
CNSUB
2
U
RD
CN20V
V
WH
M
3~
W
BK
CM
PWB 1(MAIN)
M
CNFAN
FM0
CNTH
2
2
2
TH1
TH2
TH3
Item
Description
R
Reactor
TB1-TB3
Terminal block
Th1
Heat exchanger sensor
(outdoor unit)
Th2
Outdoor air temp. sensor
Th3
Discharge pipe temp. sensor
Th4
Suction pipe temp. sensor
Indication lamp
Color
Function
Led e (1)
Red
Warning lamp
Self diagnosis function by led e
1 Time ash
Current cut
2 Time ash
Trouble of outdoor unit
3 Time ash
Over current
4 Time ash
Transmission error
5 Time ash
Over heat of compressor
6 Time ash
Error of signal transmission
7 Time ash
Lock of compressor
8 Time ash
Sensor error
(Except discharge pipe sensor)
Light on
Outdoor fan motor error
Four sec light
and
Discharge pipe sensor error
four sec o
Caution ・When the compressor does not run Immediately after
hitting on the button,wait for 5 to 10 minutes.(There is
possibility of delayed start.)
・High voltage is produced in the control box. don't touch
electrical parts in the control box for 5 minutes after
cutting power supply.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents