Outdoor Units - Mitsubishi Heavy Industries SRC25ZMP-S Technical Manual

Table of Contents

Advertisement

Symbol
A
Service valve connection(gas side)
B
Service valve connection(liquid side)
C
Pipe/cable draw-out hole
D
Drain discharge hole
E
Anchor bolt hole
40
E
322
12
D
120.5
※1
74.5
480
90.5
645
Center of gravity
Content
φ9.52(3/8")(Flare)
φ6.35(1/4")(Flare)
φ20×2places
M10×4places
Dimensions
※1
MODEL
SRC25ZMP-S
210
SRC35ZMP-S
220
20.2
57.2
Terminal block
B
147.2
Notes
(1) It must not be surrounded by walls on the four sides.
(2) The unit must be fixed with anchor bolts. An anchor bolt must not
protrude more than 15mm.
(3) Where the unit is subject to strong winds, lay it in such
a direction that the blower outlet faces perpendicularly
to the dominant wind direction.
(4) Leave 1m or more space above the unit.
(5) A wall in front of the blower outlet must not exceed the units height.
(6) The model name label is attached on the right side of the unit.
※2
※3
Intake
L2
240
103
240
108
Intake
Outlet
Minimum installation space
Examples of
installation
Dimensions
C
L1
Open
L2
100
L3
100
L4
250
A
L3
L4
Service
(
)
space
L1
280
280
180
100
Open
Open
80
80
80
Open
250
Open
Unit:mm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35zmp-sSrk45zmp-sSrk25zmp-sSrc35zmp-sSrc45zmp-s

Table of Contents