Lighting - Stanley Reginald Installation And Operating Instructions Manual

Boiler solid fuel stove
Table of Contents

Advertisement

Before lighting the stove check with the installer that the installation work and
commissioning checks described in the installation instructions have been carried
out correctly and that the chimney has been swept clean, is sound and free from any
obstructions. As part of the stove's commissioning and handover the installer
should have demonstrated how to operate correctly.
Fig.11
1.
Open firedoor and open the primary air inlet by turning the control knob on the right hand
side of the stove to setting 4 on the thermostat.
2.
Open the secondary air inlet by pulling it out fully.
3.
Cover with crumpled pieces of paper.
4.
Lay 10-12 pieces of kindling on top of the paper towards the back of the firebox.
5.
Ignite and close the firedoor.
6.
Under no circumstances should any flammable liquid i.e. petrol, paraffin etc., be
used to light the fire.
7.
When the kindling is well alight open the firedoor and add more kindling of a larger size
to sustain the fire. Close the firedoor.
8.
When a hot bed of coal is established add the normal fuel.
9.
When well lighted, adjust the thermostat to give the required heat output.
10.
To shut the fire down, do not add fuel, make sure that the firedoor is properly closed and
that the primary and secondary air controls are all in the closed position. Cutting off the
air supply will reduce the heat output.
11.
Following a prolonged shutdown of the appliance perhaps after the summer break,
ensure the flueway is free from obstruction prior to re-lighting.
Re-fuelling-Open the firedoor and reload, close the firedoor.

LIGHTING

12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents