Flue Passages; Before Leaving An Installation; Repair And Replacement Parts; Only ) - Goodman xMEC96 Series User Manual

Upflow / horizontal two-stage gas furnace
Table of Contents

Advertisement

F
P
(Q
LUE
ASSAGES
UALIFIED
The heat exchanger flue passageways should be inspected at the beginning of each heating season.
B
L
I
EFORE
EAVING AN
NSTALLATION
Cycle the furnace with the thermostat at least three times. Verify cooling and fan only operation.
Review the Owner's Manual with the homeowner and discuss proper furnace operation and maintenance.
Leave literature packet near furnace.
R
R
EPAIR AND
EPLACEMENT
When ordering any of the listed functional parts, be sure to provide the furnace model, manufacturing, and serial numbers with
the order.
Although only functional parts are shown in the parts list, all sheet metal parts, doors, etc. may be ordered by description.
Parts are available from your distributor.
Functional Parts List-
S
O
)
ERVICER
NLY
P
ARTS
Gas Valve
Gas Manifold
Natural Gas Orifice
Propane Gas Orifice
Igniter
Flame Sensor
Rollout Limit Switch
Primary Limit Switch
Auxiliary Limit Switch
Pressure Switch
Induced Draft Blower
Door Switch
Blower Motor
Blower Wheel
Blower Mounting Bracket
Blower Cutoff
Blower Housing
Transformer
Heat Exchanger with
Recuperator Coil
Coil Front Cover
Integrated Control Module
Transformer
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gmec96

Table of Contents