Circulating Air & Filters; Duct Work - Air Flow; Checking Duct Static - Goodman xMEC96 Series User Manual

Upflow / horizontal two-stage gas furnace
Table of Contents

Advertisement

Sizing Between First and Second Stage Regulator*
Maximum Propane Capacities listed are based on 2 psig pressure drop at 10 psig setting.
Capacities in 1,000 BTU/hour.
Pipe or
Tubing
Tubing Size, O.D. Type L
Length
Feet
3/8"
1/2"
10
730
1,700
3,200
20
500
1,100
30
400
920
2,000
40
370
850
1,700
50
330
770
1,500
60
300
700
1,300
80
260
610
1,200
100
220
540
1,000
125
200
490
150
190
430
175
170
400
200
160
380
To convert to capacities at 15 psig settings - multiply by 1.130
To convert to capacities at 5 psig settings - multiply by 0.879
Propane Gas Piping Chart I
C
A
& F
IRCULATING
IR
D
- A
F
UCT WORK
IR
LOW
Duct systems and register sizes must be properly designed for the CFM and external static pressure rating of the furnace. Design the
ductwork in accordance with the recommended methods of "Air Conditioning Contractors of America" Manual D.
Install the duct system in accordance with Standards of the National Board of Fire Underwriters for the Installation of Air Conditioning,
Warm Air Heating and Ventilating Systems. Pamphlets No. 90A and 90B.
A closed return duct system must be used, with the return duct connected to the furnace. NOTE: Ductwork must never be attached
to the back of the furnace. For upflow installations requiring 1800 CFM or more, use either two side returns or bottom return or a
combination of side /bottom. Flexible joints may be used for supply and return connections to reduce noise transmission. To prevent
the blower from interfering with combustion air or draft when a central return is used, a connecting duct must be installed between
the unit and the utility room wall. Never use a room, closet, or alcove as a return air chamber.
C
D
S
HECKING
UCT
TATIC
Refer to your furnace rating plate for the maximum ESP (exter-
nal duct static) rating.
Total external static refers to everything external to the fur-
nace cabinet. Cooling coils, filters, ducts, grilles, registers must
all be considered when reading your total external static pres-
sure. The supply duct pressure must be read between the furnace and the cooling coil. This reading is usually taken by
removing the "A" shaped block off plate from the end on the coil; drilling a test hole in it and reinstalling the block off plate.
Take a duct static reading at the test hole. Tape up the test hole after your test is complete. The negative pressure must be
read between the filter and the furnace blower.
Too much external static pressure will result in insufficient air that can cause excessive temperature rise. This can cause
limit switch tripping and heat exchanger failure.
To determine total external duct static pressure, proceed as follows;
1. With clean filters in the furnace, use a draft gauge (inclined manometer) to measure the static pressure of the return
duct at the inlet of the furnace. (Negative Pressure)
2. Measure the static pressure of the supply duct. (Positive Pressure)
3. The difference between the two numbers is .4" w.c.
Example:
static reading from return duct = -.1" w.c.
static reading from supply duct = .3" w.c.
total external static pressure on this system = .4" w.c.
Nominal Pipe Size
Schedule 40
5/8"
3/4"
7/8"
1/2"
5,300
8,300
3,200
220
3,700
5,800
2,200
2,900
4,700
1,800
2,700
4,100
1,600
2,400
3,700
1,500
2,200
3,300
1,300
1,900
2,900
1,200
1,700
2,600
1,000
900
1,400
2,300
900
830
1,300
2,100
830
780
1,200
1,900
770
730
1,100
1,800
720
ILTERS
Sizing Between Second or Second Stage Regulator & Appliance*
Maximum Propane Capacities listed are based on 1/2" W.C. pressure drop at 11" W.C. setting.
Capacities in 1,000 BTU/hour.
Pipe or
Tubing
Length
3/4"
Feet
3/8"
7,500
10
39
4,200
20
26
4,000
30
21
3,700
40
19
3,400
50
18
3,100
60
16
2,600
80
13
2,300
100
11
2,100
125
10
1,900
150
9
1,700
200
8
1,500
250
8
*Data in accordance wit h NFPA pamphlet No. 54
N
EVER ALLOW THE PRODUCTS OF COMBUSTION
,
MONOXIDE
TO ENTER THE RETURN DUCT WORK OR CIRCULATION AIR
.
SUPPLY
27
T ubing Size, O.D. Typ e L
1/2"
5/8"
3/4"
7 /8"
1/2"
92
199
3 29
501
275
62
131
2 16
346
189
50
107
1 81
277
152
41
90
1 45
233
129
37
79
1 31
198
114
35
72
1 21
187
103
29
62
1 04
155
89
26
55
9 0
138
78
24
48
8 1
122
69
21
43
7 2
109
63
19
39
6 6
100
54
17
36
6 0
93
48
Propane Gas Piping Chart II
WARNING
Nom inal Pipe Size
Schedu le 40
3/4"
1"
1-1/4" 1-1/2"
567
1,07 1 2,205
3,307
393
732
1,496
2,299
315
590
1,212
1,858
267
504
1,039
1,559
237
448
913
1,417
217
409
834
1,275
185
346
724
1,066
162
307
630
976
146
275
567
866
132
252
511
787
112
209
439
665
100
185
390
590
,
INCLUDING CARBON

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gmec96

Table of Contents