Toshiba Carrier RAV-SP180AT2-UL Service Manual page 103

Ac split type outdoor unit super digital inverter
Hide thumbs Also See for Carrier RAV-SP180AT2-UL:
Table of Contents

Advertisement

No. Part name
Fan motor
1) Perform work of Detachment 1 of
2) Remove the flange nut fixing the fan motor and the
propeller fan.
• The flange nut is loosened by turning it clockwise.
(When tightening it, turn it counterclockwise.)
3) Remove the propeller fan.
4) Remove screws which fix the wiring division panel and
the side cabinet. (M4, 8 mm, 2 pcs.)
5) Remove the connector for the fan motor from the inverter.
(Remove the ferrite core of the lower fan motor because
it is used.)
6) Remove the fan motor lead from the fan motor lead fixed
rubber of the penetrated part of the partition board.
7) Remove the fixing screws (4 pieces each) while
supporting the fan motor so that it does not fall down.
∗ Cautions for assembling of fan motor
• Tighten the flange nut with 4.95N•m (50kgf•cm).
• Adjust length of the fan motor lead wire at the fan
• Be sure so that the rector body does not contact
• Be sure to bundle the removed bundling band with
• Necessarily attach the ferrite core of the lower fan
Be sure to fix the fan motor lead to the motor base using
the metal band of the motor base so that the fan motor
lead does not come to contact with the propeller fan.
Procedure
motor lead fixed rubber so that the fan motor lead is
not slackened; otherwise the fan motor lead may
come to contact with the propeller fan.
Attach the fan motor lead fixed rubber to the
partition board so that the projection is set at the
refrigerating cycle side.
with the fan motor lead.
the bundling band on the market.
motor again.
(Fix it with bundling band on the market.)
XREQUIREMENTX
Projection/Refrigerating cycle side
Projection/Refrigerating cycle side
Projection/Refrigerating cycle side
,
and
.
Fan motor lead
Fan motor lead
Fan motor lead
fixed rubber
fixed rubber
fixed rubber
– 103 –
Remarks
Propeller fan
Propeller fan
Propeller fan
Loosened by
Loosened by
Loosened by
turning clockwise
turning clockwise
turning clockwise
Flange nut
Flange nut
Flange nut
Propeller fan
Propeller fan
Propeller fan
Fan motor
Fan motor
Fan motor
Wiring
Wiring
Wiring
division panel
division panel
division panel
Screws
Screws
Screws
(3 pcs.)
(3 pcs.)
(3 pcs.)
Connector of
Connector of
Connector of
upper fan motor
upper fan motor
upper fan motor
Connector of
Connector of
Connector of
lower fan motor
lower fan motor
lower fan motor
Ferrite core of
Ferrite core of
Ferrite core of
lower fan motor
lower fan motor
lower fan motor
Fan motor lead
Fan motor lead
Fan motor lead
fixed rubber
fixed rubber
fixed rubber
Projection/Refrigerating cycle side
Projection/Refrigerating cycle side
Projection/Refrigerating cycle side
Fan motor
Fan motor
Fan motor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents