Dimensions And Fixings - Baxi Combi 130 HE Installation And Servicing Instructions

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

(1 in 20)
D
Tube Ø 110mm
Key To Support Bracket
1 Domestic Hot Water Outlet
2 Cold Water Inlet
3 Gas Supply
8
Supplied By www.heating spares.co Tel. 0161 620 6677
E
DIMENSIONS
A 850mm
B 320mm
A
C 490mm
D 125mm Ø Min.
E 150mm
B
F 136mm
360° Orientation
C
F
4 Central Heating Flow
5 Central Heating Return
6 Pressure Relief
63 mm
62 mm
1
2

5.0 Dimensions and Fixings

SIDE FLUE (left and right)
For every 1m of horizontal flue
length, the clearance above the
top of the flue elbow should be
55mm to incorporate the 3°
(1 in 20) fall in the flue from the
terminal to the elbow.
Flue length (Y)
up to 1m
1m - 2m
2m - 3m
Y
X
Support Bracket
Tap Rail
C/L
77 mm
74.5 mm
3
4
Clearance (X)
55mm
110mm
165mm
(1 in 20)
The 3° (1 in 20) fall provided
by the elbow is to allow
condensate to run back to the
boiler, for disposal through the
condensate discharge pipe.
50 mm
Top View
of Tap Rail
5
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents