Baxi Combi 130 HE Installation And Servicing Instructions page 43

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

Central Insulation
Panel
Burner Securing
Screws
Supplied By www.heating spares.co Tel. 0161 620 6677
Upper Insulation
Panel
Lower Insulation
Panel
Burner
Combustion Box
Base
Support Bracket
Combustion Box Base
Securing Bolts
Fig. 84
13.0 Changing Components
13.27
Heat Exchanger Insulation Pads
(Fig. 84)
1. Remove the fan and condensate trap (see
section 13.21 and 13.24).
2. Remove the burner (see section 13. 25).
3. Remove the four bolts securing the
combustion box base.
4. Remove the combustion box base.
5. Pull the central insulation panel down from the
centre of the heat exchanger and remove the
insulation pads.
6. Check combustion box seal for damage,
replace if necessary.
7. Fit the new insulation pads and reassemble in
reverse order.
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents