Baxi Combi 130 HE Installation And Servicing Instructions page 47

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

Ignition Lockout
15.0 Fault Finding
NO
Incorrect gas supply to
Is 19-20 mbar dynamic at
boiler.
Replace Main PCB.
gas valve inlet ?
YES
YES
YES
YES
Is
Is
NO
Is there gas but no spark?
Is spark probe
spark gap between 3 and
wiring from Main PCB to
damaged ?
4mm ?
spark probe OK ?
NO
YES
NO
Set spark gap to
Replace spark probe.
Rectify wiring.
3.5mm.
NO
YES
Is
Go to Gas Valve Fault
there spark
section of the fault
finding instructions.
but no gas ?
NO
YES
Are
the sensing tubes
Unblock sensing tubes.
blocked ?
NO
Is
YES
NO
wiring from
Is
the detection probe
Main PCB to detection
Replace Main PCB.
damaged ?
probe OK ?
YES
NO
Replace detection
Rectify wiring.
probe.
47
Supplied By www.heating spares.co Tel. 0161 620 6677

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents