High Altitude Operation; Electrical Connections - Lincoln Electric RANGER 9 IM753-A Operator's Manual

Multi-process gasoline engine driven welder and power generator
Table of Contents

Advertisement

A-5
ANGLE OF OPERATION
Internal combustion engines are designed to run in a
level condition which is where the optimum perfor-
mance is achieved. The maximum angle of operation
for the engine is 15 degrees from horizontal in any
direction. If the engine is to be operated at an angle,
provisions must be made for checking and maintain-
ing the oil at the normal (FULL) oil capacity in the
crankcase in a level condition.
When operating the welder at an angle, the effective
fuel capacity will be slightly less than the specified 10
gallons.

HIGH ALTITUDE OPERATION

If the Ranger 9 will be consistently operated at alti-
tudes above 5000ft.(1524m), a carburetor jet
designed for high altitudes should be installed. This
will result in better fuel economy, cleaner exhaust,
and longer spark plug life. It will not give increased
power which is decreased at higher altitudes. Engine
horsepower is reduced by 3.5% per 1000ft.(304.8m)
for altitudes above 377ft.(114.9m).
CAUTION
Do not operate a Ranger 9 with a high altitude jet
installed at altitudes below 5000ft.(1529m). This
will result in the engine running too lean and
result in higher engine operating temperatures
which can shorten engine life.
-----------------------------------------------------------------------
High altitude jet kits are available from the engine
manufacturer. Contact your local Onan, or Kohler
Authorized Dealer.
Muffler Relocation
WARNING
Shut off welder and allow muffler to cool before
touching muffler.
The Ranger 9 is shipped with the exhaust coming
out on the left side. The exhaust can be changed
to the opposite side by removing the two screws
that hold the exhaust port cover in place and
installing the cover on the opposite side.
(Operating the Ranger 9 without the cover in
place will result in a higher noise level and no
increase in machine output.)
---------------------------------------------------
INSTALLATION
CONNECTION OF LINCOLN ELECTRIC
WIRE FEEDERS
Shut off welder before making any electrical
connections.
-----------------------------------------------------------------------
Connection of the LN-7 or LN-8 to the
Ranger 9.
Shut off the welder.
• Connect the LN-7 or LN-8 per the instructions on
the the appropriate connection diagram in the rear
of this manual.
• Set the output control toggle switch to appropriate
position: "CONTROL REMOTE" for LN-8 and LN-7
with K857 attached; "CONTROL AT WELDER' for
LN-7 with no remote voltage control.
• Set "POLARITY" switch to either WIRE FEED DC+
or WIRE FEED DC-.
* Set the "RANGE" switch to either HIGH, MED or
LOW as required by the process.
• Set the 'WELDING TERMINALS" Control switch to
the 'REMOTELY CONTROLLED" position.
• Set the 'IDLER" switch to the "HIGH"idle position.
Connection of the LN-742 to the Ranger 9
• Shut off the welder.
• Connect per the instructions on the appropriate con
nection diagram in the rear of this manual.
• Set the output control toggle switch to 'CONTROL
AT WELDER" when not using remote control.
When the LN-742 has a K589-1 remote control
attached, set output control to "REMOTE".
• Set "POLARITY" switch to either WIRE FEED DC+
or WIRE FEED DC-.
• Set the 'RANGE'"switch to either HIGH, MED or
LOW as required by the process.
• Set the 'WELDING TERMINALS" Control switch to
the 'REMOTELY CONTROLLED" position.
• Set the 'IDLER" switch to the "AUTO" idle position.
RANGER 9
WARNING
A-5
.

Advertisement

Table of Contents
loading

Table of Contents