Oki C9600 Service Manual page 77

Hide thumbs Also See for C9600:
Table of Contents

Advertisement

(4) Installation of internal hard disk
Install internal hard disk for the following occasions
• When authentication, validation, buffer printing and saving the data are necessary
• When PDF direct printing is necessary
• When adding Adobe Type 1 is necessary
• When "Collate Error" appears
• When Print Job Accounting (option) is used
Note! Contact with a maker for download application and compatibility prior to download a
font.
Memo The hard disk is divided into three partitions such as "PCL", "SHARING" and "PSE", and
each partition size is allocated as below.
1. Power off printer and remove power supply cord and printer cable.
Note! Installing options to printers while the printers are powered on may cause a problem with
the printers.
2. Loose 2 screws on the upper and lower area and open the gate side of printer.
42930511TH Rev. 2
PCL
SHARING
PSE
Power supply cord
OFF
Screws
(2 places)
Gate
Oki Data CONFIDENTIAL
20%
50%
30%
Printer cable
77 /

Advertisement

Table of Contents
loading

This manual is also suitable for:

C9800

Table of Contents