Installing The Poe Injector Hub; Desktop Installation; Rack Mounting - Planet HPOE-2400G User Manual

Ieee 802.3at 12 / 24-port gigabit power over ethernet managed injector hub
Hide thumbs Also See for HPOE-2400G:
Table of Contents

Advertisement

2.2 Installing the PoE Injector Hub

This section describes how to install your PoE Injector Hub and make connections to the PoE Injector Hub. Please read the
following topics and perform the procedures in the order being presented. PLANET PoE Injector Hub do not need software
configuration. To install the PoE Injector Hub on a desktop or shelf, simply complete the following steps.

2.2.1 Desktop Installation

To install a PoE Injector Hub on a desktop or shelf, simply complete the following steps:
Step1: Attach the rubber feet to the recessed areas on the bottom of the PoE Injector Hub.
Step2: Place the PoE Injector Hub on a desktop or shelf near an AC power source.
Step3: Keep enough ventilation space between the PoE Injector Hub and the surrounding objects.
When choosing a location, please keep in mind the environmental restrictions discussed in Chapter
1, Section 5, in Specification.
Step4: Connect your PoE Injector Hub to network 802.3at / 802.3af powered devices (PD) and Switch.
A. Connect one end of a standard network cable to the upper stack 10/100/1000 RJ-45 ports on the front of the PoE
Injector Hub.
B. Connect the other end of the cable to the 802.3at / 802.3af powered devices (PD) such as IP phone, wireless
access point, IP camera, splitter, or switch etc.
Connect the one end of a standard network cable to the relative lower stack 10/100/1000 RJ-45 port on the front
C.
of the PoE Injector Hub.
Connect the other end of the cable to the port of Switch.
D.
Connects to the PoE Injector Hub require UTP Category 5e/6 network cabling with RJ-45 tips. For
more information, please see the Cabling Specification in Appendix A.
Step5:
Supply power to the PoE Injector Hub.
Connect one end of the power cable to the PoE Injector Hub.
A.
Connect the power plug of the power cable to a standard wall outlet.
B.
When the PoE Injector Hub receives power, the Power LED should remain solid Green.

2.2.2 Rack Mounting

To install the PoE Injector Hub in a 19-inch standard rack, follow the instructions described below.
Step1: Place your PoE Injector Hub on a hard flat surface, with the front panel positioned towards your front side.
Step2: Attach a rack-mount bracket to each side of the PoE Injector Hub with supplied screws attached to the package.
Figure 2-2-1
shows how to attach brackets to one side of the PoE Injector Hub.
User's Manual of HPOE-1200G / HPOE2400G
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpoe-1200g

Table of Contents