Preparing for installation
Connections on the primary side type BWC . . .
Required devices
Pos.
Description
1
Heat pump
2
Primary pump (installed and connected)
3
Geothermal probes/geothermal collectors
4
Brine distributor for geothermal probes/collectors
5
Brine accessory pack
6
Brine pressure limiter (accessory, if no brine pressure limiter is con-
nected, insert a jumper across terminals 1X3.8 and 1X3.9 prior to
commissioning)
7
Frost protection monitor of the AC-Box (if an AC-Box is connected,
connect the frost protection monitor in series with the brine pressure
limiter)
8
Integral control unit
Note
For further information regarding the
terminal markings and PCBs, see
page 63.
Electrical connection
LP PCB (see page 63)
24
(cont.)