IBM InfoPrint Color 100 Introduction And Planning Manual page 52

Ibm infoprint color 100
Table of Contents

Advertisement

Table 10. Systems Assurance Checklist (continued)
Weeks Before
Install
4-6
Does the customer have an appropriate
electrical supply and power receptacle?
v Print unit electrical supply
v Print unit electrical connector (and plug if
required), for print unit. (Hubbell receptacle
460-R9V0–United States only.)
v Cooling unit electrical supply
v Cooling unit electrical connector (and plug
if required).
v RIP controller electrical supply
Optional
v Service modem electrical supply
v Service modem phone line
v Additional phone line for voice
communication during service modem use.
4-6
Have all cables, connectors, and adapters
required for this installation been ordered?
Customer Supplied
v Hubbell receptacle 460-R9V0–United
States only
v LAN cabling if required
v If necessary, adapter and/or outlet for
CEE7 VII plug used with the cooling
unit–World Trade only
4-6
Has Service ordered the onsite maintenance
parts? The CE RETAIN system has this
information.
4-6
Has an vacuum cleaner been ordered?
4-6
Has a stepladder been ordered? A 2 m (6 ft)
fiberglass ladder is recommended.
2-4
Complete the TCP/IP Configuration and
Start-up worksheet with the customer, to be
available at installation time.
2-4
Verify that operator training has been
scheduled.
2-4
Have the service representatives been
trained?
2-4
Is there workspace and storage space for the
service representative?
2-4
Is the customer-ordered hardware on site?
(Vacuum cleaner, loupe, ladder).
2-4
Has the service representative arranged for
the installation tools to be available?
2-4
Have arrangements been made for movers
or riggers to move the printer to the
installation site?
38
IBM InfoPrint Color 100 Introduction and Planning Guide
Task
Task Owner
Yes/No
Due Date
Date
Done