D20 Power Supply Bulkhead - IBM eserver pSeries 7311 D10 Service Manual

Hide thumbs Also See for eserver pSeries 7311 D10:
Table of Contents

Advertisement

D20 Power Supply Bulkhead

Before performing the following procedure, read the "Safety Considerations" on
page 53.
Power Supply Bulkhead Removal
To remove the power supply bulkhead, do the following:
1. Open the rack front door.
2. Shut down the system as described in "Stopping the System" on page 55.
3. Put the Model D20 subsystem into the service position.
4. Disconnect the power source from the system.
Note: This system may be equipped with a second power supply. Before
5. Open the service access cover as described in "Opening the Service Access
Cover" on page 127.
6. Disconnect the RIO-G cables from the RIO connectors located on the rear of the
subsystem.
7. Disconnect the power cables from the power supplies
8. Label, then disconnect all PCI adapter cables from their respective adapters.
9. Remove the power supplies or power supply filler as described in "Power Supply
Removal" on page 169.
10. Remove the RIO bus adapter as described in "RIO Bus Adapter Removal" on
page 139.
11. Remove all PCI adapters as described in "Non-Hot-Pluggable PCI Adapter
Removal" on page 145.
Note: Alternately remove the PCI dividers as you are removing the PCI adapters.
12. Remove the three upper retaining screws that secure the top edge of the power
supply bulkhead to the subsystem chassis.
13. Remove the three lower retaining screws that secure the bottom portion of the
power supply bulkhead to the subsystem chassis.
14. Remove the power supply bulkhead by lifting it straight up and out of the
subsystem.
Eserver pSeries 7311 Model D10 and Model D20 Service Guide
172
continuing with this procedure, ensure that the power source to the system
has been completely disconnected.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pseries 7311 d20

Table of Contents