D10 Power Supply - IBM eserver pSeries 7311 D10 Service Manual

Hide thumbs Also See for eserver pSeries 7311 D10:
Table of Contents

Advertisement

Note: The I/O backplane and the SPCN connector card are replaced as a pair.
6. Reinstall the RIO bus adapter card. (See "D10 RIO Bus Adapter" on page 121).
7. Reinstall the power supplies. (See "D10 Power Supply").
8. Reinstall the cover. (See "D10 Covers" on page 59).
9. Reinstall all PCI adapters. (See "D10 PCI Adapters" on page 61).
10. Return the I/O subsystem to the operating position (see "D10 Operating Position"
on page 57) and connect RIO, SPCN, and adapter cables.
11. Connect the power cables.
12. Power the system on.

D10 Power Supply

Before performing the following procedure, read the "Safety Considerations" on
page 53.
Removal
Attention:
procedures. Power supplies are considered as hot-pluggable FRUs only if you remove
one power supply at a time. The power supplies can be removed from the front of the
I/O subsystem.
1. Disconnect the power cord from the power supply.
2. Unlatch the power supply handle and rotate the handle downward to unseat the
power supply.
Attention:
cannot replace the power supply in less than four minutes, shut down the system
and then remove the power supply.
3. Pull the power supply straight out from the I/O subsystem.
Replacement
To replace the power supply, perform the steps in the removal procedure in reverse
order.
Do not remove two power supplies at the same time if performing hot-plug
Do not remove a power supply for more than four minutes. If you
Chapter 8. Removal and Replacement Procedures
123

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pseries 7311 d20

Table of Contents