Ppendix A: Dip Switch Settings On Host Psu Board - Interlogix FP 2000 Series Installation And Commissioning Manual

Table of Contents

Advertisement

A
A: DIP
PPENDIX
On host power supply board:
SW1
SW2
SW3
OFF
OFF
OFF
OFF
OFF
ON
OFF
ON
OFF
OFF
ON
ON
ON
OFF
OFF
ON
OFF
ON
ON
ON
OFF
ON
ON
ON
ON
=
Upper position
OFF =
Lower position
The location of the DIP-switch is shown in Figure 7 (position 12).
Note: If a SD1200 or SD2000 is mounted in the panel VdS mode is not fully supported.
FP/FR1100/1200/2000 V6: Installation and Commissioning Manual
SWITCH SETTINGS ON HOST
(FP/FR2
BOARD
SW4
SW5
SW6
SW7
ON
OFF
OFF
OFF
OFF
ON
ON
OFF
ON
ON
)
XXX
SW8
OPTION
Aritech (950 Series)
Sentrol (2000 Series)
EN Operation
VdS Operation
NEN Operation
EP Operation
Language Group
1
English
English
Italian
Lithuanian
Dutch (Belgium)
Polish
Portuguese
Hungarian
Dutch (Holland)
Czech
German
Slovakian
French
Russian
Spanish
PSU
2
3
English
Lithuanian
Danish
Swedish
Norwegian
Finnish
Estonian
Latvian
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fr 1200series

Table of Contents