I/O Subsystems (7 and 8) RIO Cabling to the Third I/O Book

C1
C2
C3
1
2
3
4
4B
92
pSeries 690 Installation Guide
Shown with IBFs
C1
C0
C1
D0
D1
4B
4B
1
2
3
Primary Rack
Secondary Rack
Third I/O Book (Book 3)
First /O Subsystem
Second Subsystem
Third I/O Subsystem
Fourth I/O Subsystem
Two IBFs (maximum),
Position 4
C3
5
Fifth I/O Subsystem
6
Sixth I/O Subsystem
7
Seventh I/O Subsystem
8
Eighth I/O Subsystem
C0
Connection to I/O Book (Book 3)
C1
Connection to I/O Book (Book 3)
D0
Connection to I/O Book (Book 3)
D1
Connection to I/O Book (Book 3)