Nailing Brackets - Travis Industries 864 HH Installation Manual

Built-in direct vent fireplace
Hide thumbs Also See for 864 HH:
Table of Contents

Advertisement

14

Nailing Brackets

There are four nailing brackets
on the front of the fireplace.
Follow the directions below to
prepare the nailing brackets.
Once in place, nail or screw the
nailing brackets to the framing.
NOTE: Additional nailing
brackets are provided along
the base of the fireplace.
Use these brackets if not
using the front brackets.
1/2" Drywall
For installations using
1/2" facing fold the larger
tab out 90° (use a
screwdriver if necessary).
5/8" Drywall
For installations using
5/8" drywall fold the
shorter tab out 90° (use
a screwdriver if
necessary).
© Travis Industries
Installation
(for qualified installers only)
TOP VIEW
Fireplace
TOP VIEW
Fireplace
4080214
Make sure the fireplace is
square and plumb when
placed in the framing.
Measured corner-to-
corner, the fireplace
should be square (approx.
54-7/8" for each
dimension). Use shims to
insure the fireplace is
square.
Framing
Nailing Bracket
Drywall
Framing
Nailing Bracket
Drywall
100-01182_003

Advertisement

Table of Contents
loading

Table of Contents