2-Panel Door Installation - FPI P36D-NG1 Owners & Installation Manual

Zero clearance direct vent gas fireplace
Hide thumbs Also See for P36D-NG1:
Table of Contents

Advertisement

2-PANEL DOOR INSTALLATION

1) Install sub-frame by hooking top over glass door, push in bottom of
frame and secure with 2 screws.
Secure bottom of
sub-frame with
screws.
2) Mount 2-panel door frame to fl ange on sub-frame, ensuring to line
up holes. Secure using the 6 screws provided.
3) Hook left side door to door frame by placing the door hinges (top &
bottom) over pins on door frame. Repeat for right side door.
Note: It will be easier to put the door in place by starting with the
bottom hinge.
Left Side Door
Note: If you fi nd that the left or right side door is lower then the other,
use the spacer provided to help align the doors.
The spacer is to be placed over the bottom pin before installing the
screen door.
62
THE KENSINGTON
Sub-Frame
Pin on door frame
REGENCY™ SERIES OPTIONS
& BALMORAL FRONT
®
3-PANEL DOOR INSTALLATION
1) Install sub-frame by hooking top over glass door, push in bottom of
frame and secure with 2 screws.
Secure bottom of
sub-frame with
screws.
2) Mount 3-panel door frame to fl ange on sub-frame, ensuring to line-up
holes. Secure using the 4 screws provided.
FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
Sub-Frame

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P36d-lp1P36d-1

Table of Contents