UNIT INSTALLATION WITH
HORIZONTAL TERMINATON
Install the vent system according to the
manufacturer's instructions included with
the components.
1) Set the unit in its desired location. Check
to determine if wall studs or roof rafters
are in the way when the venting system is
attached. If this is the case, you may want
to adjust the location of the unit. Rough in
the gas preferably on the right side of the
unit and the electrical (junction block is on
the left side) on the left.
2) Direct Vent pipe and fi ttings are designed with
special twist-lock connections to connect the
venting system to the appliance fl ue outlet. A
twist-lock appliance adaptor is an available
option that must be used in conjunction with
the Simpson Dura-Vent Direct Vent GS
system.
3) Put a bead of silicone inside the outer section
of the adapter and a bead of Mill Pac on
the inner collar. Slip the adapter over the
existing inner and outer fl ue collar and fasten
to the outer collar only with the 3 supplied
screws (drilling pilot holes will make this
easier). Level the fi replace and fasten it to
the framing using nails or screws through
the nailing strips.
4) Assemble the desired combination of pipe
and elbows to the appliance adaptor and
twist-lock for a solid connection.
Notes:
a) Twist-lock procedure: Four indentations,
located on the female ends of pipes and
fi ttings, are designed to slide straight
onto the male ends of adjacent pipes
and fi ttings, by orienting the four pipe
indentations so they match and slide
in to the four entry slots on the male
ends, Diagram 1. Push the pipe sections
completely
together, then twist-lock
one section clockwise approximately
one-quarter turn, until the two sections
are fully locked. The female locking lugs
will not be visible from the outside, on
the Black Pipe or fi ttings. They may be
located by examining the inside of the
female ends.
Diagram 1
NOTE:
For best results and optimum
performance with each approved venting
system, it is highly recommended to apply
"Mill-Pac" sealant (supplied) to every in-
ner pipe connection. Failure to do so may
result in drafting or performance issues not
covered under warranty. Silicone (red RTV)
is optional.
32
b) Horizontal runs of vent must be
supported every three feet. Wall straps
are available for this purpose.
5) Mark the wall for a 10" x 10" square hole. The
center of the square hole should line up with
the centerline of the horizontal pipe. Cut and
frame the 10 inch square hole in the exterior
wall where the vent will be terminated. If the
wall being penetrated is constructed of non-
combustible material, i.e. masonry block or
concrete, a 7"(178mm) dia. (7-1/2"(191mm)
dia. for fl ex) hole is acceptable.
Note:
With
D u r a - Ve n t ,
the minimum
h e i g h t
i s
achieved by
i n s t a l l i n g
a 90
o
elbow
d i r e c t l y t o
the rigid pipe
adaptor.
Diagram 2
Notes:
a) The horizontal run of vent must be level,
or have a 1/4 inch rise for every 1 foot
of run towards the termination. Never
allow the vent to run downward. This
could cause high temperatures and may
present the possibility of a fi re.
b) The location of the horizontal vent
termination on an exterior wall must meet
all local and national building codes, and
must not be blocked or obstructed. For
External Vent Terminal Locations, see
Exterior Vent Termination Location.
c) Snorkel Terminations:
For installations requiring a vertical
rise on the exterior of the building, 14-
inch and 36-inch tall
Snorkel Terminations
are available, as well
as the standard Riser
Vent. Follow
the same instal-
lation proce-
dures as
used for
standard
Horizon-
t a l Te r -
mination.
N E V E R
install the
s n o r k e l
u p s i d e
down.
Diagram 3
INSTALLATION
*Diagrams 3 & 4: As specifi ed in CGA B149
Installation Code. Local codes or regulations
may require different clearances.
Below Grade Installation
If the Snorkel Termination must be installed
below grade, i.e. basement application, proper
drainage must be provided to prevent water
from entering the Snorkel Termination. Refer
to Diagram 4. Do not attempt to enclose the
Snorkel within the wall, or any other type of
enclosure.
Diagram 4
NOTE: For Snorkel terminations in ABOVE
grade installations, follow national
or local code requirements.
6) The arrow on the vent cap should
be pointing up. Insure that the 1-1/2"
clearances to combustible materials
are maintained (Diagram 4). Install the
termination cap.
FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
Note: Riser Vent
is only for use
in above grade
terminations.
Diagram 3a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P36d-lp1P36d-1

Table of Contents