4. Installation Instructions
4-8. Transporting the Outdoor Unit
When transporting the unit, have it delivered as close to the
installation site as possible without unpacking.
Use a hook for suspending the unit. (Fig. 4-7)
CAUTION
When hoisting the outdoor unit, pass ropes or straps un-
der the bottom plate as shown in the figure at right. When
hoisting, the angle between the rope and top panel must
be 70° or greater so that the rope does not come into con-
tact with the fan guard.
(Use 2 lengths of rope 7.5 meters long or longer.)
When passing the ropes through the square holes of the
bottom plate:
Place the rope in the outer edge of the square holes.
Use protective panels or padding at all locations where the
rope contacts the outer casing or other parts to prevent
scratching. In particular, use protective material (such as
cloth or cardboard) to prevent the edges of the top panel
from being scratched.
Be careful of the fan.
There is danger of injury if the fan starts to turn during
inspection. Be sure to turn OFF the remote power switch
before beginning inspection.
4-9. Installing the Outdoor Unit
(1) Use anchor bolts (M12) or similar to securely anchor the
unit in place. (Fig. 4-8)
(2) Be sure the rubber vibration insulator and platform extend
to the inside of the legs. In addition, the washers used
to anchor the unit from the top must be larger than the
installation anchor holes. (Figs. 4-8 and 4-9)
890 (Ceiling panel dimensions)
890 (Ceiling panel dimensions)
790 (Installation hole pitch)
790 (Installation hole pitch)
2770 (Installation hole pitch)
1880 (Ceiling panel dimensions)
890 (Ceiling panel dimensions)
790 (Installation hole pitch)
1780 (Installation hole pitch)
2870
890 (Ceiling panel dimensions)
790 (Installation hole pitch)
Top view
890 (Ceiling panel dimensions)
790 (Installation hole pitch)
Top view
Design of W-2WAY ECO-i SYSTEM Unit Specifications
Plate leg
Anchor bolts
Washer
The vibration insulator, base, or platform must be large
enough to bear the full surface of the base plate legs.
4
15
20 hole
(Positions where anchor bolts are fastened)
Installation anchor hole (4
790 (Installation hole pitch)
Unit: mm
890 (Ceiling panel dimensions)
Fig. 4-10
2-33
Fig. 4-7
Vibration insulator
50
Base
Unit: mm
(100)
Fig. 4-8
(Detailed view of legs)
Unit: mm
38.5
Fig. 4-9
×
15
20 oval holes)
1
2
3
4
5
6
7
8