Finalizing Maintenance - A.O. Smith ADMR-40 Installation, User And Service Manual

Admr series commercial atmospheric water heater
Table of Contents

Advertisement

s
15.5 Finalizing
maintenance
Instruction manual ADMR
5. Undo the screws on the draught diverter.
6. Remove the draught diverter from the appliance.
7. Undo the screws of the lid in the top side of the appliance.
8. Remove the lid from the appliance.
9. Remove the sealing ring from the appliance.
Warning
The flue baffles can be hot.
1. Remove the flue baffles from the appliance.
2. Check the flue baffles for the presence of corrosion, removing this if
necessary.
3. Check the flue baffles for wear, and replace the flue baffles if necessary.
4. Place a new sealing ring on the rim of the tank and re-fit the lid.
5. Fit the draught diverter
6. Fit the flue damper
(3.9.3 "Fitting the flue
7. Fit the flue gas sensor
(3.9.4 "Fitting the flue gas
8. Re-fit the protective cover.
To finalize the maintenance carry out the following steps:
1. Fill the appliance
(5
"Filling").
2. Start the appliance
(9 "Starting and
3. Erase the message SERVICE REQUIRED. Do this by pressing once on
then once on
(3.9.2 "Fitting the draught
diverter").
damper").
sensor").
running").
.
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

Admr-50Admr-60Admr-115Admr-135Admr-80Admr-90

Table of Contents