Master Base Station Configuration - Avaya DECT R4 Installation Manual

Ip office release 7.0
Table of Contents

Advertisement

8.4 Master Base Station Configuration

The base station installation process consists of the following stages:
1.Default the base station.
2.Access the base station configuration.
3.Update the base station firmware.
4.Set the base station IP address.
5.Set the time source.
6.Set the QoS/ToS settings.
7.Enable status logging by the AIWS.
8.Set the base station as the master base station.
9.Select the PBX Switch mode.
10.Configure the IP trunk.
11.Enable the radio settings.
12.Enter the PARI code.
13.Enter the SARI/PARK code.
14.Configure Air Synch.
15.Configure IP Office Directory Integration.
16.Reset the base station.
17.Check the base station.
DECT R4
IP Office Release 7.0
15-601047 Issue 03a (21 February 2011)
Page 126

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip office dect r437403749

Table of Contents