BOILER LOCATION

Install this boiler in a clean, dry location with adequate air supply and close to a good vent connection. Do
not locate this boiler in an area where it will be subject to freezing.
The boiler is suitable for installation on combustible flooring and should be located close to a floor drain in
an area where leakage from the boiler or connections will not result in damage to the adjacent area or to
lower floors in the structure. If necessary a suitable drain pan should be installed under the boiler.
If the boiler is installed above the level of the building's radiation system, a low water cutoff device must be
installed in the boiler outlet at the time of installation. Some local codes require the installation of a low
water cutoff on all systems. Locate the boiler so as to provide adequate clearance for inspection and
service all around the unit. It is recommended that 24" be provided for the top and sides and 48" for the
front. This boiler is suitable for alcove installation with minimum clearances to combustibles as follows:
For boiler's dimensions see Figure 1 and table 1
Model 60 - 300
Model 400 - 600
Side View (Left)
TOP:
SIDES:
REAR:
VENT:
FLOOR:
Front View
Side View (Right)
Figure 1
3
12"
12"
12"
6"
0"
Side View (Right) Condensing

Advertisement

Table of Contents
loading

Table of Contents