Before installation

4. Before installation
4.1 Converting the exhaust and
supply air connection
Fig. 4: Conversion of the exhaust connection
16
The exhaust and supply air connection can be converted to adapt to the local con-
ditions of the installation room.

4.1.1 Converting the exhaust connection

In the following picture the conversion of the top passage to the side or rear pas-
sage of the exhaust connection is represented.
5
4
3
1. Remove lower rear wall (2) of the EuroCondense three
2. Remove the gas connection leading upward and make a 87°arc (1)
3. Turn 87°arc (1) in the desired position (side or towards the rear)
4. Remove either the rear cover plate (3) or the side cover plate (4)
5. Mount lower rear wall (2)
6. Glue upper cover plate (5)

4.1.2 Converting the supply air connection

In the following picture the conversion of the top passage to the side or rear pas-
sage of the supply air connection is represented.
Condensing gas boiler Eurocondense three125-300 kW
2
1
7308536-02 06.13