Installation; Unpack The Boiler; Unpack The Flue Terminal - Potterton Ultra 30 Installation & Servicing Manual

Ultra range of wall mounted fan assisted balanced flue gas boilers
Table of Contents

Advertisement

3.
INSTALLATION - PAGE 10
3.1

UNPACK THE BOILER

Refer to Fig. 6.
1.
Carefully unpack the boiler.
2.
Do not discard any packaging until all the items are
accounted for, see Fig. 6.
3.
Place the case pack and foam seal to one side so as not to
damage the case parts before fitting them. See Fig. 29 for
case parts.
4.
Check that the boiler fixings pack contains:-
Four No.8 x 12 lg. c'sk hd. screws.
Six No.6 x 10 lg. pan hd. screws.
Two M4 x 10 lg. c'sk hd. screws.
Four M6 x 10 lg. hex. hd. screws.
Two 28 mm nuts and olives.
3.2

UNPACK THE FLUE TERMINAL

Refer to Fig. 7.
1.
Carefully unpack the flue/terminal assembly.
2.
Do not discard any packaging until all the items are
accounted for, see Fig. 7.
3.
Bend the cutting jig to shape as shown in Fig. 7. The jig is
easily bent by hand.
Supplied By www.heating spares.co Tel. 0161 620 6677
Fig.6
Fig. 7

Advertisement

Table of Contents
loading

Table of Contents