Robertshaw RS4110 Installation Manual page 12

Rs4000 series rs5000 series rs6000 series
Hide thumbs Also See for RS4110:
Table of Contents

Advertisement

Available languages

Available languages

Press
to step through the following:
Installation Tests for Single Stage Models
Demand
First Stage Heat
First Stage Cool
* G,
will be off (not displayed) for Non-HP with Gas.
Installation Tests for Multi-Stage Models
Demand
First Stage Heat
Second Stage
Heat
Third Stage /
Emergency Heat
First Stage Cool
Second Stage
Cool
* G,
will be off (not displayed) for Non-HP with Gas
The display will now show the day, the
setpoint, fan setting and off.
Exiting the Installation Test Utility returns the
thermostat to normal operation.
Refer to the User Manual to change day, time and schedule.
The Thermostat is now ready to begin operation.
The thermostat will be in the OFF (default) mode at start up.
The following sections will explain how to select the mode of operation
and how to protect the settings.
Conventional (Non-HP)
Terminal
W1 + G*
Y1 + G
Conventional (Non-HP)
Terminal
W1 + G*
W1 + W2 + G*
N/A
Y1 + G
Y1 + Y2 + G
Display
Y1 + G + O
Display
Terminal
Y1 + G + B
Y1 + W2 +G + B
2
Y1 + G + O
Y1 + Y2 + G + O 2
2
12
Heat Pump (HP)
Terminal
Display
Y1 + G
Heat Pump (HP)
Display
E + G
E
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs4220Rs4320Rs5220Rs6110Rs6220Rs6320 ... Show all

Table of Contents