3Ware 9650SE Installation Manual page 32

Serial ata raid controller
Hide thumbs Also See for 3ware 9650SE:
Table of Contents

Advertisement

Chapter 3. Installing the Battery Backup Unit
Figure 20. Points of connection on the half-height controller
a) Slots for the clips
b) BBU receptacle c) Hole for post
Figure 21. Points of connection on the full-height controller
a) Hole and slots for the clips
c) Hole for post
b) BBU receptacle
28
3ware 9650SE Serial ATA RAID Controller Installation Guide

Advertisement

Table of Contents
loading

Table of Contents