Completing The Installation; Connecting The Cables - IBM 326 Type 8848 Installation Manual

Hide thumbs Also See for 326 Type 8848:
Table of Contents

Advertisement

Completing the installation

Complete the following steps to complete the installation:
1. Position the internal cables so they do not interfere with the cover installation.
2. Position the cover on top of the server and slide it forward. Press down on the
3. If you removed the bezel, position the bezel directly in front of the server and
4. If you removed the USB option tray, insert it fully into the slot below hard disk
5. Install the server in the rack. For details, see the Rack Installation Instructions
6. To attach peripheral devices and connect the power cord, continue with

Connecting the cables

This section provides basic information about attaching peripheral devices such as
a keyboard and pointing device to the server.
For detailed information about external options and how to connect them to your
server, see the documentation that comes with these options. For the location of
external ports and connectors on the server, see the User's Guide on the IBM
Eserver Documentation CD.
Depending on the options that you installed, after cabling the server, you might
need to run the Configuration/Setup Utility program to update the server
configuration. For more information, see "Updating the server configuration" on
page 25 and the User's Guide on the IBM Eserver Documentation CD.
To attach non-USB devices to the server, use the cables that come with the devices
and connect the cables to the appropriate ports on the server.
24
326 Type 8848: Installation Guide
Attention:
Before sliding the cover forward, make sure that all the tabs on
both the front and rear of the cover engage the chassis correctly. If all the tabs
do not engage the chassis correctly, it will be very difficult to remove the cover
later.
cover latch. The cover slides forward into position. Make sure that the cover
engages the tabs at the front and rear of the server.
press it into place so that the retention tabs snap into the holes on the top, right
side, and bottom of the server.
drive bay 1.
that come with the server.
"Connecting the cables."
Note: If you installed a SCSI drive, check the LEDs to verify proper operation
after you reconnect the power cord.

Advertisement

Table of Contents
loading

Table of Contents