New Buck Corporation 18 User Manual page 35

Non-catalytic unit
Hide thumbs Also See for 18:
Table of Contents

Advertisement

1. Recheck specified clearances.
2. Remove all foreign material from firebox area.
3 . Open primary air draft.
NOTE: Plug power cord into a 115 VAC outlet. Route cord to prevent damage to cord
insulation from heat and sharp objects. Keep cord out of way of traffic to prevent damage
caused by tripping, etc.
4. Place crumpled pieces of newspaper in stove. Light it and close door. Ensure that stove
draws properly through primary draft.
5. Check for smoke leaks around door.
6. Open door and check for smoke escaping from front of stove. Smoking usually indicates
a defective or poorly positioned chimney. Some chimneys with a marginal draft can be
preheated by lighting newspaper and holding it near open damper with a poker or fire tong.
Once chimney heats up, a proper draft can usually be obtained.
If a thorough review of Troubleshooting Guide in rear of manual does not reveal problem,
contact your dealer for assistance.
THE UNIT IS PAINTED WITH A SPECIALLY FORMULATED HIGH
TEMPERATURE PAINT THAT CURES DURING FIRST TWO OR THREE FIRINGS.
YOU MAY NOTICE A SLIGHT SMOKING EFFECT AND AN ODOR OF BURNING
PAINT WHEN YOU BUILD FIRST FIRES. THIS IS NORMAL AND IS NOT A
CAUSE FOR ALARM. IN SOME CASES, THESE FUMES WILL ACTIVATE A
SMOKE ALARM. OPENING A WINDOW NEAR UNIT WILL ALLOW THESE
FUMES TO ESCAPE. DO NOT BUILD A LARGE ROARING FIRE UNTIL THIS
CURING PROCESS IS COMPLETE OR HEATER FINISH MAY BE DAMAGED.
FINAL CHECK
CAUTION
Page 33

Advertisement

Table of Contents
loading

Table of Contents