New Buck Corporation 18 User Manual page 17

Non-catalytic unit
Hide thumbs Also See for 18:
Table of Contents

Advertisement

B. To complete this installation, follow basic masonry fireplace trim kit instructions
EXCEPT:
The trim kit may have to be cut down in size so as not to block any cooling vents/
chambers of Zero Clearance Fireplace.
C. To complete methods 1 and 2, position heater into ZC Fireplace and center flue exit under
connection.
D. Slide connector (or slip connector) down into flue exit of heater approximately 3/8".
Now, seal connector to heater (and fireplace throat if method #1 is used) using refractory
cement.
CAUTION: Do not loosen ceramic brick.
CAUTION: Crimped end of connector must be placed into heater throat.
E. Check installation minimum clearances and install an approved heater extension or floor
protector to meet at least minimum clearances.
Page 15

Advertisement

Table of Contents
loading

Table of Contents