New Buck Corporation 18 User Manual page 33

Non-catalytic unit
Hide thumbs Also See for 18:
Table of Contents

Advertisement

24" min.
(610 mm)
For ceiling exit using close clearance listed chimney
1. Suspend a plumb bob from ceiling above unit so that weight is hanging in center of flue
exit. (A small weight on a string will serve as a plumb bob). Mark ceiling where string is
suspended to locate center of chimney hole.
2. After locating center of hole install ceiling support box, chimney, flashing and rain cap
using listed chimney only. Only use pipe listed in this manual.
REFER TO CHIMNEY MANUFACTURER'S INSTRUCTIONS FOR ASSEMBLY
AND DISASSEMBLY OF CHIMNEY PARTS. BE SURE TO FOLLOW CHIMNEY
INSTRUCTIONS FOR PROPER CLEARANCES TO COMBUSTIBLE AND PROPER
AIR SPACING REQUIRED.
3. Add additional pipe until both of the following are met:
(a) Chimney pipe is 3 feet higher than roof at point where it penetrates roof and
RAIN CAP
36" TYP.
FLASHING
RADIATION SHIELD
20 FT. MAX.
OUTSIDE AIR DUCT THROUGH FLOOR WHEN
MOBLE HOME IS NOT UNDERPENNED
Figure 12
CAUTION
Page 31
24" min.
(610 mm)
OUTSIDE AIR DUCT THROUGH UNDERPENNED
RAIN CAP
36" TYP.
FLASHING
RADIATION SHIELD

Advertisement

Table of Contents
loading

Table of Contents