Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
COMPRESSOR, OVERLOAD,
& RELAY
Relay
Start (S)
Common (C)
WARNING
Electrical Shock Hazard
Refer to page 4-20 for the procedure for servic-
ing the compressor, overload, and relay.
1.
2.
3.
Overload
4.
5.
Run (M)
5-5
Unplug ice maker or disconnect power.
Set the ohmmeter to the R x 1 scale.
To test the compressor windings:
a) Touch one of the ohmmeter test leads
to the Common (C) pin, and the other
lead to the Start (S) pin. The meter
should indicate between 8 and 11 Ω.
b) Touch one of the ohmmeter test leads
to the Common (C) pin, and the other
lead to the Run (M) pin. The meter
should indicate between 2 and 3 Ω.
To test the overload, touch the ohmme-
ter test leads to the terminals. The meter
should indicate a closed circuit (0 Ω).
Terminals
To test the relay, touch the ohmmeter
test leads to the following test points:
Terminal 2 to pin M = 0 Ω.
Terminal 2 to pin S = 4.3 Ω
Terminal 2
Overload
Pin S
Pin M
Relay