EBM Installation

A small amount of arcing may occur when connecting an EBM to the UPS. This is normal and
will not harm personnel. Insert the EBM cable into the UPS battery connector quickly and
firmly.
To install the optional EBM(s):
1.
2.
EATON Powerware
Align each joining bracket with the adjacent cabinet screw holes
and secure with the supplied screws (see Figure 8).
If installing additional cabinets, repeat Step 6 for each cabinet.
Joining Bracket
Figure 8. Installing the Joining Brackets (Top View)
Continue to the following section, "EBM Installation."
Verify that all battery circuit breakers are in the OFF (O) position
(see Figure 9).
Plug the EBM cable of the first EBM into the UPS battery
connector.
If additional EBMs are to be installed, plug the EBM cable of the
second cabinet into the battery connector on the first EBM. Repeat
for each additional EBM. Up to four EBMs may be connected to the
UPS.
®
9125 Two-in-One UPS (5000/6000 VA) User's Guide
UPS
EBM
C A U T I O N
S
164201513 Rev B
www.powerware.com
INSTALLATION
Joining Bracket
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents