5.6

Pretest Roundabout

Application:
Start:
Stop (main switch):
Sequence:

5.6.1 Pretest sequence roundabout

1
3 sec
2
75 sec
3
open
4
20 sec
5
45 sec
Spares Operation 07.02 A. B.
This Pretest was developed for the test roundabout in the
works. Only the components fill-in solenoid, recycling
pump, heating and lye pump are controlled.
Switch OFF main switch
Close door
The following key combinations are applicable for the following
control systems:
Press and hold
2 keys / PNC 153 0259-08/2: Eco (LED Eco and pre-rinse)
5 keys / PNC 153 0259-05/8: Eco and pre-rinse together
8 keys / PNC 153 0259-09/0: Half-load and Eco together
Switch ON main switch
Hold the key(s) pressed for at least 5 sec (corresponding LEDs
are flashing during this time)
The display shows the lower circle of the number 8 and/or the
corresponding LEDs are permanently lit
The programme starts to run
If you stop the programme by means of the main switch, you
can immediately select a wash programme when switching ON
again.
If you start the pretest again - as described under Start - the
programme jumps directly to Step 5, first pumping the water off
the trough (corresponding LEDs flashing at the end).
Now you can restart the pretest - as described under Start.
See attached sequence plan.
Check, if all LED's are working
Fixed filling time of 75 sec
When level 1 is switched on, heating until water
temp. has reached 60 C,
otherwise main pump on only for 120 sec
without heater
Paused, LED flashing
Fixed draining, DW is going to be emptied
- 35 -
599 51 13 34