C8
Refitting (continued).
Refit:
- The timing cover (6).
- The auxiliary drive pulley.
- The screws (4), tighten to 2,1 ± 0,2 m.daN.
B1EK0V7D
- The timing cover (5).
- The torque reaction rod (3).
- The screws (1) and (2), tighten to 4,5 ± 0,4 m.daN.
Refit the auxiliary drive belt (see corresponding operation).
Continue the refitting operations in reverse order to removal.
B1EK1T7D
CHECKING AND SETTING THE VALVE TIMING
Engine : RFN
120
9
2003