2
Note: Check to insure that the flexible tubing lies flat on
the base pan surface.
4. Slide the top bracket down the copper sensing tube.
ForYSC036E-060E, andYHC036-037E units insert the
tab on the left side into the slot on the indoor coil block
off and secure the right side of the bracket with one of
the 3 screws removed in step 2. Refer to
p.
32. ForYHC047E-067E,YHC048E/F-060E/F ,YSC072F-
32
120F ,YHC120E andYHC072F-102F units secure the tab
on left side to the indoor coil block off with one of the
screws removed in step 2 and secure the right side of
the bracket with one of the screws removed from the
access panel. Refer to
5. Using the remaining 2 screws removed in step 2,
secure the bottom bracket. Refer to
Note: Larger diameter holes on bottom bracket line up
with the dimples on the rear panel.The smaller
diameter holes line up with the screw holes in the
rear panel.
Main Electrical Power
Requirements
Hazardous Voltage w/Capacitors!
Disconnect all electric power, including remote
disconnects and discharge all motor start/run
capacitors before servicing. Follow proper lockout/
tagout procedures to ensure the power cannot be
inadvertently energized. Verify with an appropriate
voltmeter that all capacitors have discharged. Failure to
disconnect power and discharge capacitors before
servicing could result in death or serious injury.
For additional information regarding the safe discharge
of capacitors, see PROD-SVB06A-EN
Proper Field Wiring and Grounding
Required!
All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements for
field wiring installation and grounding as described in
NEC and your local/state electrical codes. Failure to
follow code could result in death or serious injury.
Verify that the power supply complies with the unit
nameplate specifications.
Inspect all control panel components; tighten any
loose connections.
Connect properly sized and protected power supply
wiring to a field-supplied/installed disconnect switch
and to the main power terminal block (HTB1) in the unit
control panel.
Install proper grounding wires to an earth ground.
Figure 34,
Figure 35, p.
32.
Figure 34, p.
WARNING
WARNING
RT-SVX21P-EN
32.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ysc060eYhc036eYsc067eYhc037eYhc072eYsc072f ... Show all

Table of Contents