Route the power cord through the power cord anchor or cable management arm.
5.
Reposition the cable management arm into the operating position.
6.
Connect the power cord to the power source.
7.
Be sure that the power supply LED is green
8.
Verify that the corresponding power supply LED on the SID is green.
9.
Expansion board options
The server supports PCI, PCI-X, and PCI Express expansion boards.
Removing expansion slot covers
CAUTION:
remove all AC power cords before removing or installing the PCI riser cage.
CAUTION:
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
Power down the server (on page 22).
1.
Extend the server from the rack (on page 22).
2.
Remove the access panel (on page 23).
3.
Remove the PCI riser cage (on page 26).
4.
Remove the expansion slot cover:
5.
To remove slot cover 1 or 4, push in on the retainer to release it, and then slide out the cover.
o
To prevent damage to the server or expansion boards, power down the server and
For proper cooling do not operate the server without the access panel, baffles,
("Rear panel LEDs and
buttons" on page 12).
Hardware options installation 53